DESCRIPTION OF THE AREA


INGETEC has extensive experience in 115 kV, 230 kV and 500 kV systems. He has participated in the planning, design and supervision of the assembly and construction of the first 230 kV electrical interconnection system in Colombia, with a total of 570 km of double circuit lines and four substations. Likewise, it has designed and supervised the construction of important 230 kV lines and substations in different regions of Colombia.

transmission lines and electrical substations


The scope of services provided includes:


    Planning of electrical systems. Selection of routes. Optimal location of structures and layout of lines. Civil and electrical designs. Fiber optic communications systems, PLC, microwaves, etc. Instrumentation, control and protection systems. Remote control and supervision systems (SCADA). Geotechnical designs of transmission towers. Structural designs.


SOME RELATED PROJECTS

By INGETEC SAS • January 24, 2024
DESCRIPCIÓN DEL PROYECTO Estudio de impacto ambiental y Plan de Manejo Ambiental Operativo de la línea Betania – San Bernardino.
By INGETEC SAS • January 22, 2024
DESCRIPCIÓN DEL PROYECTO Diseños para la llegada de la línea de transmisión Chivor – Torca y salida de las líneas de transmisión Torca – La Mesa y Chivor – Paipa, con Torres de 230kV en doble circuito.